Concept Development (CD)

  • Conceptual design supplement

  • Revise layout & land use plan

  • Revise perspective rendering

  • Preparing technical solutions

  • Detailed material list 

  • Presentation within 20 days

Basic Drawing for Permit

  • Preparation for permission

  • Site layout & Land use plan

  • Floor plan, Elevation & Section

  • Landscaping plan

  • Submit within 20 days

  • Consulting permission process

Detailed Cost Estimate

  • Reflecting CD & basic drawings

  • Breakdown for detailed works

  • Building cost analysis

  • Cost control within Pre-FS  

  • If over, provide its solution

  • Submit within 10 days